Colorado Eastern - Site Prep/Start
Now that the lumber was cut and ready to install, let's take a stroll out to the project site to make sure I did a decent job preparing the ground. The holes were dug so that each post would be 50% buried - so the holes are half the height of the posts. Remember to make the posts level front-back, left-right and top-centered. When setting the posts, use a thin tamping stick and several different layers of fill to help stabilize the hole. Note sod rolled up and out of the way.

You'll see that these photos show a combination of work that has already been completed, along with work in progress. Original marker stakes are replaced with wood stakes, posts are sunk to depth and filled, back wall is constructed.

PROJECT DATE: 09/06/03


Basic tools required: post hole digger, shovel, tamping stick, level, hammer.

Total cost-to-date: $240


Early stages of progress - post hole digging, framework.


Overview of site progress to-date.

background ] track plan ] excavating ] supplies ] [ site prep ] framework ] wiring ] dirt ] track ] trestle1 ] trestle2 ] trestle3 ] complete ] photos ]
 

© 2008 Leaders & Best Consulting

site updated: 02/17/08